Edge-Core ECS3510-26T EUK Guía de instalación Pagina 51

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 80
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 50
C
HAPTER
4
| Making Network Connections
Twisted-Pair Devices
– 51 –
NETWORK WIRING CONNECTIONS
Today, the punch-down block is an integral part of many of the newer equipment
racks. Actually it is a part of the patch panel. Instructions for making
connections in the wiring closet with this type of equipment follows.
1. Attach one end of a patch cable to an available port on the switch, and the
other end to the patch panel.
2. If not already in place, attach one end of a cable segment to the back of the
patch panel where the punch-down block is located, and the other end to a
modular wall outlet.
3. Label the cables to simplify future troubleshooting. See "Cable Labeling and
Connection Records" on page 56.
Figure 19: Network Wiring Connections
ECS351026T-
Equipment Rack
(side view)
Switch
Patch Panel
Punch-Down Block
Wall
Vista de pagina 50
1 2 ... 46 47 48 49 50 51 52 53 54 55 56 ... 79 80

Comentarios a estos manuales

Sin comentarios